Two N2O abatement projects from Rashtriya Chemicals Fertilizers accounted for 1.35 million CER generation potential: being amongst the larger projects getting registered. Unexpectedly, a leading indicator for future projects is strong in November.

Our pipeline review and analysis follows the format established in the quarterly report. For some background you can get more details by clicking here.

Leading indicator 1: Projects requesting prior consideration in India
We have had to revise our October figures of projects submitted for prior consideration significantly upwards. It appears that the UNFCCC system has had lags towards the end of the month. Our October numbers for projects submitted for prior consideration have moved up from 27 to 62 for India; and the global number has moved up from 80 to 218. The November provisional numbers are also high at 47 for India and 137 for global projects. It would appear that one of two things is happening: (a) developing countries are sending a signal on the ongoing need for CDM; and/or (b) organizations are looking to capture the opportunity remaining over the next 24 months that the Kyoto protocol exists. (It may be recalled that in the last couple of months the UNEP Risoe CDM/ JI pipeline had reduced the forecasted number of CERs available through the end of 2012).

We will be releasing a revised November figure in a few days as soon as the UNFCCC system is updated.

The table below at the end of this article has additional details on the projects submitted from India.

Leading indicator 2: Projects requesting registration
9  projects from India requested registration which forms 22% of the global number.

1 Installation of Bundled Composting Project in the state of Tamil Nadu
2 Emission free electricity generation at Harihar, Karnataka
3 Waste Heat Recovery Based Power generation at Vision Sponge Iron Private Ltd, West Bengal, India
4 Biomass Gasification based Power Generation by Beach Minerals Company Private Limited in India.
5 Reduction in specific steam consumption ratio of Process Air Compressor of Ammonia plant at Indo Gulf Fertilisers, (A unit of Aditya Birla Nuvo Limited) Jagdishpur.
6 Biomass based power project at T-Kallupatti village, Madurai District, Tamil Nadu, India
7 340 MW Gas based combined cycle power project expansion at Hazira
8 Bagasse based cogeneration project of Nizam Deccan Sugars Limited (NDSL)
9 51 MW wind power project of ONGC at Surajbari, Gujarat in India

 

Projects registered:
A total of 23 CDM projects were registered in November (34 in October) with a potential of generating 2.9 million CERs annually (2.1 million in October). Of these 5 projects (22%) came from India with a potential of generating 1.46 million CERs (49% of the amount issued globally).

Usually projects from India have been smaller in size. But in November two projects (out of the total 5) are from Rashtriya Chemical Fertilizers Limited and these N2O abatement projects account for 1.35 million CERs.

Count of projects registered in November:
Project_count

CERs expected from the projects registered in November:

CER_Redn

Projects registered from India in November:

Reference Title Registered Reductions
2801 N2O abatement in MP Nitric Acid plants at Rashtriya Chemicals & Fertilizers Limited, India 29-Nov-09 901 968
2792 N2O abatement in HP Nitric Acid plants at Rashtriya Chemicals & Fertilizers Limited, India 20-Nov-09 447 305
2736 24 MW Shamburi Mini Hydel Project, Karnataka, India 16-Nov-09 63 643
2790 Avoidance of HFC-134a emissions in rigid Poly Urethane Foam (PUF) manufacturing by Acme TelePower Limited (ATPL) 8-Nov-09 24 540
2894 12.5 MW Small Scale Grid Connected Wind Electricity Generation Project by KRBL Ltd., District Dhule, Maharashtra, India 2-Nov-09 19 644

CER Issuance
A total of 219,417 CERs (approx value of 2.7m Euros or US$ 4m based on current spot prices) were issued over the last month in India. The global CER issuance for November was 5.74 million CERs.

The average CER per project from India for this month was 31K CERs (28K for Oct) per project continue to be lower as compared to the global average 117K (98K for Oct) CERs per project for November

CER Issuance November:
CER_Issuance

Additional Resources
Data Monitor
JAS Quarterly review: India CDM activity depressed, some innovative projects in pipeline

 

Table: Projects requesting prior consideration in November 2009 

  Project title Entity Name
1 1.23 MW wind power project in Tamil Nadu Aspire Systems (India) Pvt. Ltd
2 Avoidance of fossil fuel by burning hydrogen for thermal application in chemical plant in Chincholi, India Balaji Amines Ltd
3 24 MW Bagasse based cogeneration activity at Gulbarga District, Karnataka, India Core Green Sugar and Fuels Private Limited
4 SAMS Wind Project City Life Developers
5 1.25 MW Wind Power CDM Project by Jayshri Impex, Dhoraji Road, Opp G.E.B Sub Station, Jetpur Jayshri Impex
6 0.6 MW Wind Power CDM Project by Balkrishna Textile Industries, Dhoraji Road, Near Railway Crossing Balkrishna Textile Industries
7 1.25 MW Wind Power CDM Project by Royal Impex (India), National Highway 8B, Dhoraji Road, Village Pedhla Royal Impex (India)
8 Grid Connected Wind Power Project in Tamilnadu by JaiHind Wire Rod Mills Limited Jai Hind Winre Rod Mills Ltd.,
9 HVPL. Wind Power Project at Ratan Ka Bas Hindusthan Vidyut Products Limited
10 1.25 MW wind power project in Tamil Nadu Aspire Systems (India) Pvt. Ltd
11 Green Electricity Generation from Wind Power Project located in Coimbatore, India Sheela Clinic
12 Fuel switch using biomass gasification at Godrej & Boyce Mfg. Co. Ltd Godrej & Boyce Mfg. Co. Ltd.
13 Arvind Construction 2.10 MW Wind Project in Rajasthan Arvind Construction Co. Private Limited
14 600 MW Wind Power Project in Tamilnadu G.R.THANGA MALIGAI JEWELLERS (P) LTD
15 Energy efficiency projects at GSKCH, Dowlaiswaram, India GlaxoSmithKline Consumer Healthcare Ltd
16 Wind Power Project at Tamilnadu by Dalmia Laminators Limited Dalmia Laminators Limited
17 6 MW demonstration project by MEDA at Alamprabhu, Kolhapur Maharashtra Energy Development Agency (MEDA)
18 Biomethanation power project by Shakti Enviro Greens Pvt Ltd Shakti Enviro Greens Pvt Ltd
19 Wind Power Project at Gujarat by Powerica Limited Powerica Limited
20 10 MW Biomass Power Project by Shalivahana (Biomass) Power Projects Limited Shalivahana (Biomass) Power Projects Limited
21 Fuel Switch to renewable energy by community participation in Yavatmal district Greenway Ecodevelopment Pvt Ltd
22 Grid connected wind Power Project in Jodhpur, Rajasthan KS Oils Ltd
23 SAMS Wind Project3 Wham Investments Private Ltd.
24 10 MW Biomass based renewable energy generation for the grid by Junagadh Power Projects (P) Ltd Junagadh Power Projects Pvt. Ltd.
25 15 MW Biomass Power Project by Shalivahana Green Energy Limited Shalivahana Green Energy Limited
26 3 MW (2 1.5 MW) Bundled Wind Power Project at Rajasthan Om Prakash Agarwal & Satish Kumar Goyal (Owners)
27 6 Mw Wind Electricity Generation Project By Krbl Ltd Distt Jodhpur,Rajasthan KRBL Limited
28 Installation of biogas plants in Gujarat by GAICL Gujarat Agro Industries Corporation Limited. (GAICL)
29 Grid Connected Wind Power Project M/s Mahabal Metals Pvt. Ltd.
30 Bagasse based cogeneration unit at Gurdaspur Punjab Chadhars Sugars & Industries Limited
31 Orient Abrasives Ltd. - Rajasthan Wind Power Project Orient Abrasives Limited
32 Bagasse Based Cogeneration Project at Shermau, District- Saharanpur, UP, India Uttam Sugar Mills Ltd.
33 Electricity generation from 0.225 MW wind energy project Vivek Agro Products
34 Kamlang Hydroelectric Project (3 X 7MW), Arunachal Pradesh (India) Sai Krishnodaya Industries (P) Limited
35 Greenhouse Gas Emission Reductions Through rail based mass rapid transit system - by Delhi Airport Metro Express Pvt Ltd Delhi Airport Metro Express Pvt Limited
36 Grid connected renewable electricity generation in Tamil Nadu, (Maharaja Theme Parks & Resorts Ltd - SF No. 232-1) M/s. Maharaja Theme Parks & Resorts Ltd
37 SAMS Wind Project2 Vijay Steel Corporation
38 Grid connected renewable electricity generation in Tamil Nadu, (SF No. 117-2, Tamil Nadu - 600kW) -Bundled project by Sreyas M/s. Maharaja Theme Parks & Resorts Ltd
39 Fuel switch from coal to renewable biomass for heating thermic fluid in Thermopack unit of Maral Overseas Limited Maral Overseas Limited
40 Electrical Power generation from Renewable Source of Energy - Bundled WTGs in India2 Daksh Minerals & Marine Pvt. Ltd.
41 Efficient Irrigation Pump Sets Program on HVDS Feeders at Doddaballapura Subdivision Enzen Global Solutions Private Limited
42 Greenhouse Gas Emission Reduction through rail based mass rapid transit system - Mumbai Metro Transport Private Limited Mumbai Metro Transport Private Limited
43 Biomass residue fired bioler for steam and power requirements Kudos Chemie Ltd.
44 1.25 MW Wind Power CDM Project by Goutham Industries Unit II, Hubli - Karnataka, India Goutham Industries Unit II
45 2.10 MW Wind Power Project by Ms Chhotabhai Jethabhai Patel & Co. (CJP) at Belwa Ranaji Village, Shergarh Taluka, Jodhpur District M/s Chhotabhai Jethabhai Patel & Co.
46 Grid Connected wind farm renewable Energy Product M/s Mirra and Mirra Industries
47 Grid Connected wind farm renewable Energy Project M/s Precision Controls